The installation of the fifth hydro unit at Kruonis Pump Storage Hydroelectric Power Plant is already well underway.
This pipeline section is 12 meter long, 5,25 m high and weigh about 37 tons.
Products with such parameters pose for us many challenges.
Pipe part will be delivered to Kruonis and the surface will be coated with an anti-corrosion coating in the installed painting shop.
Completed works:
Rolling of blanks;
Longitudinal welding of rolled blanks;
Calibration of welded blanks during rolling;
Assembly of calibrated blanks and welding of circumferential seams.